Uploaded image for project: 'CiviCRM'
  1. CiviCRM
  2. CRM-20165

The date is no longer kept in the scheduled job logs

    Details

    • Versioning Impact:
      None (no code merged)
    • Documentation Required?:
      None
    • Funding Source:
      Needs Funding
    • Verified?:
      No

      Description

      In the scheduled job log (civicrm/admin/joblog&reset=1), the date column is empty. The column civicrm_job_log.run_time has NULL values in the database.

      This worked in 4.6, so data is lost with the upgrade to 4.7 (hence the Critical rating, although the job log in an of itself is not really critical).

        Attachments

          Activity

            People

            • Assignee:
              Unassigned
              Reporter:
              nganivet Nicolas Ganivet
            • Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

              Dates

              • Created:
                Updated: